The Bridge is located in a seismically active area (Zone 4) close to an active fault. Multi-mode response spectrum analysis was carried out to assess the Response of the Bridge to Seismic Excitation. This is a Pre-stressed Concrete Box Girder Bridge built by the Cantilever Method, with a maximum span of 89 meters.


Client China Xinjiang Beixin Construction & Engineering (Group) Co., Ltd.