Sinaw Water Supply Project, OMAN
NDA provided Civil/Structural Design and Construction Drawings for Two Elevated Tanks (900 & 700 cum and heights 30 m & 23 m respectively), Under Ground Reservoir Tank (4,000 cum) and process buildings.
NDA provided Civil/Structural Design and Construction Drawings for Two Elevated Tanks (900 & 700 cum and heights 30 m & 23 m respectively), Under Ground Reservoir Tank (4,000 cum) and process buildings.
Design of Three Tanks (Each Capacity 10,000 MC) including Civil/Structural, Mechanical, Electrical and Instrumentation.
Construction of 30 MW pulverized Coal-fired Captive Power Plant at DG Khan Cement factory in Khofli Sattai, Dera Ghazi Khan. NDA provided complete Design/Review and Value Engineering services for Civil/Structural Works including Turbine House, Boiler House, Control Center Room/Deaerator Building, Coal Bunker Bay/Coal Mill, Coal Transporting Trestle, Crusher House, De-sulfur Tower, Bag Filter Unit, Ash Bin, Slag Bin, Cooling Tower & Pump Station, DM Water Plant, Oil Tank/Pump Room, Compressor Building and other related Infrastructure Works.
Review of Civil/Structural Design for the combined cycle power plant and auxiliary works.
NDA carried out complete Civil/Structural Design/Review and Value Engineering and prepared Construction Drawings for the 18 MW Coal Based Power Plant Project.
Complete Design/Review of Civil/Structural Works including 60m High RCC Chimney, 2 Boilers (50 ton each) Foundation and Pedestal, Turbine Building, Main workshop Building, Coal Crusher Building, Dry Coal Shed, Weigh Bridge, Weigh Bridge Office, Security Office, Pipe Racks, T-Supports, Platforms & Equipment Foundations, RCC Storage Tanks, Steel Storage Tank Foundations, Boundary Wall and Infrastructure Works.
NDA carried out complete Civil/Structural Design/Review and Value Engineering and prepared Construction Drawings for the 18 MW Coal Based Power Plant Project.
Al Fajr & Shaheen JV hired NDA to provide Civil/Structural as well as Hydraulic Design for the 2.6 MW Hydropower project including Head Race, Tail Race, Diversion Canal, Spillway and Power House.
NDA provided Consultancy services and pre-bid design for Weir, Head Race Canal (2.6 Km long), Siphon inlet pound, Siphon underneath the river bed, Siphon, outlet pound, Penstock and Power House.
Power House Structure (project was located in a seismically active area catering to a maximum credible earth quake of 0.40g). 1 km long Penstock (4 m. diameter, Head 180 m).