Alba Petroleum Coke Calciner Plant, Bahrain
NDA carried out Structural Analysis and prepared Construction and Shop Drawings to strengthen the Rotary Coke Cooler Foundation, Train #1 Feed Plinth Layout.
NDA carried out Structural Analysis and prepared Construction and Shop Drawings to strengthen the Rotary Coke Cooler Foundation, Train #1 Feed Plinth Layout.
Structural Assessment of Links, Exit Ramps & Basement Passage for Reduction Lines 1, 2, and 3. NDA provided Investigation Program, Review of in situ testing, Structural Analysis of the Building Framing System, Design check of the Structural Members (including Foundations), and Prepare structural appraisal report
Civil/Structural Design and Construction Drawings for Micropile and Pile Cap of Coke Handling System
Structural Assessment and Detailed Design provided for Strengthening Regime of Water Reservoir 15 meter Diameter and 20 meter high above FGL NDA provided Investigation Program, Review of in situ testing, and Structural Analysis of the Reservoir Framing System, Design check of the Structural Members (including Foundations), Prepare structural appraisal report and Detailed Design provided for Strengthening Regime with PC CARBO COMB PLUS stirrup.
Structural/Geotechnical Design and Construction Drawings for Shoring System required for the addition and replacement of Sea Water Supply and Return Piles lines.
A complex of buildings including academic block, Faculty Residences, Students Hostels, Roads and Infrastructure with a plot area of 4600 kanals.
This is a Car Parking Building, with a total built up area of 15,000 sq. [...]
NDA provided Structural Steelwork Fabrication Drawings.
Russeifa is a 240 tons per hour facility. The services extended by NDA included Project management and review of the design submitted by the project contractors M/s T.A.M.E S.A & Ale'mar Contracting Engineers, a Joint Venture between companies from Greece and Jordan.
Complete Design/Review of Civil Structural Works including 60m High RCC Chimney, Coal Fired Boiler and Steam Turbine (2x45T/h +1xN 3MW) Foundation and Pedestal, Five Storey RCC Frame Structure Building, Coal Crusher Building, Lime Stone Workshop Building, Dry Coal Shed, Weigh Bridge, Weigh Bridge Office, Security Office, Pipe Racks, T- Supports, Platforms & Equipment’s Foundations, RCC Storage Tanks, Steel Storage Tank Foundations, RCC Culvert, Boundary Wall and Infrastructural Works.
*Powered by themekiller.com anime4online.com animextoon.com apk4phone.com tengag.com moviekillers.com